title
Ordinance Making Supplemental Appropriation in the Amount of $3,000,000 for the South 17th Street Multi-Use Path Project (2TRSW22102) in the Streets and Sidewalks Fund
body
Department:
Engineering
Meeting Date:
3/4/2025
Contact Name:
Rachel McIntyre
Public Hearing:
No
Contact Phone:
910-765-0581
Advertising Date/Advertised By:
N/A
Attachments:
Attachment #1: S. 17th Street MUP Ordinance
PURPOSE:
The purpose of this ordinance is to make supplemental appropriation in the amount of $3,000,000 for the S. 17th Street Multi-Use Path project, and is related to the companion resolution to authorize the City Manager to enter into a supplemental agreement with the North Carolina Department of Transportation ("NCDOT") for the S. 17th Street Multi-Use Path project. This project will provide a multi-use path along the west side of S. 17th Street from Harbour Drive to US 117/Shipyard Boulevard, as well as crosswalks and pedestrian signals at the intersection of S. 17th Street and US 117/Shipyard Boulevard.
BACKGROUND:
The S. 17th Street Multi-Use Path project was submitted by the WMPO for Prioritization 2.0 in 2011. The project, which included a multi-use path along S. 17th Street from Hospital Plaza Drive to Independence Boulevard, was the highest scoring bicycle project in the State and was included in the 2013-2023 State/Metropolitan Transportation Improvement Programs ("STIP"). The 2013-2023 STIP was adopted by the North Carolina Board of Transportation in September 2012. The project scope has since been reduced to the current limits because of budgetary constraints.
In the Fall of 2023, at approximately 30% design, staff determined that additional funding would be required to complete the design and construct the full scope of the project. This determination was based on the opinion of overall project cost by NCDOT and the City's engineering design consultant. The total estimated project cost is $3,917,423.50.
In September 2024, City Council approved...