Legislation Details

File #: 26-0260    Version: 1 Name:
Type: Resolution Status: To Be Introduced
File created: 9/4/2026 In control: Engineering
On agenda: 10/6/2026 Final action:
Title: Resolution Awarding a Construction Contract to East Coast Contracting, Inc. of Wilmington, NC in the Amount of $1,096,362 for the Pirate Cove Drainage Improvement Project
Attachments: 1. Resolution, 2. Certified Bid Tab, 3. Project Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

 Resolution Awarding a Construction Contract to East Coast Contracting, Inc. of Wilmington, NC in the Amount of $1,096,362 for the Pirate Cove Drainage Improvement Project

 

body

Department:

Design & Construction

Meeting Date:

10/6/2026

Contact Name:

Robert Baker

Public Hearing:

No

Contact Phone:

910-473-5129

Advertising Date/Advertised By:

N/A

Attachments: 

 #1: Resolution;  #2: Certified Bid Tab pdf;  #3: Project Area Map pdf

 

PURPOSE: 

The purpose of this resolution is to award a construction contract to East Coast Contracting, Inc. of Wilmington, NC in the amount of $1,096,362 for the Pirate Cove Drainage Improvement Project.

 

 

BACKGROUND:   

City Staff received Pirate Cove Drainage Improvement Project (“Project”) bids on August 13, 2026, and the lowest responsive and responsible bidder, as indicated in the attached certified bid tabulation, is East Coast Contracting.

 

This project extends from Greenville Loop Road and along portions of West Blackbeard Road and Buccaneer Rd, as shown on the attached Project area map for reference. The City has collaborated with an engineering design consultant to finalize the construction drawings and obtain all necessary Project permits. The City also acquired various easements within the Project area for long-term maintenance of the drainage way, which include permanent drainage easements and temporary construction easements. The Project’s purpose is to reduce flooding of streets and private property within the Project area and to provide long-term maintenance

 

 

budget

BUDGET IMPACT:  

Funds are available for this Project in the Stormwater Capital Projects fund for the Pirate Cove Drainage Improvement Project.

 

 

recommendation

RECOMMENDATION / ACTION REQUESTED:

Staff recommend passage of this resolution.